Installing the F-Fork Assembly for Selmer Mark VI Soprano Saxophones

1 – Get Started

2 – Remove Keys

3

4

5A – Add cork to build up ledge

5B – Add cork to build up ledge
5C – Add cork to build up ledge
5D – Add cork to build up ledge
6A – Additional method for building up ledge using Steel Stik
6B – Additional method for building up ledge using Steel Stik
6C – Additional method for building up ledge using Steel Stik
6D – Additional method for building up ledge using Steel Stik
7A – Insert F-Fork Assembly
7B – Mark Spot to Drill Hole
7C – Check Alignment
7D – Check Alignment
8
9
10
11A – Drill Hole
11B – Drill Hole